Flood exercise today

The flood exercise mentioned in the last post, testing and demonstrating readiness to deploy defences, is under way today. In South Hinksey temporary barriers are being set up by the Environment Agency (EA). At Bullstake Close on the Botley Road the barriers there, which have been used before in a flood, will be erected; and fire crews are showing how the pipe which has been installed under the Botley Road can be used to deal with flood water and reduce the flooding of the road.

For South Hinksey this is a very reassuring demonstration of the ability to now defend the village from flooding. Such barriers have never been used here before.

Of course Oxford still needs a bigger, more permanent scheme – in the form of the Oxford Flood Alleviation Scheme. The OFA update in the previous post summarises the present position – the Scheme is under way, albeit delayed. In the meantime today’s activities show that we will not be without ¬†protection in the interim.

Emma Howard-Boyd, Chair of the EA, and Sir James Bevan, Chief Executive, are in South Hinksey today to see what’s being done and meet the teams and there is no doubt that protecting Oxford in both the short and long term is being taken very seriously.

Our thanks to everyone who is working hard on behalf of the many local residents, businesses and other organisations affected by flooding.